• Universal Primary Injection Test Equipment for Substation Assets
  • Universal Primary Injection Test Equipment for Substation Assets
  • Universal Primary Injection Test Equipment for Substation Assets
  • Universal Primary Injection Test Equipment for Substation Assets
  • Universal Primary Injection Test Equipment for Substation Assets
  • Universal Primary Injection Test Equipment for Substation Assets

Universal Primary Injection Test Equipment for Substation Assets

After-sales Service: Response on Customers′ Questions Within 12 Hours.
Warranty: 12 Months
Max Diameter of Workpiece: <500mm
Shipping Cost:

Estimated freight per unit.

about shipping cost and estimated delivery time.
Payment Method: visa mastercard discover JCB diners club american express T/T
  Initial Payment Full Payment
Currency: US$
Return&refunds: You can apply for a refund up to 30 days after receipt of the products.
From payment to delivery, we protect your trading.
Universal Primary Injection Test Equipment for Substation Assets pictures & photos
Universal Primary Injection Test Equipment for Substation Assets
US $1,000-10,000 / Set
Min. Order: 1 Set
Gold Member Since 2022

Suppliers with verified business licenses

Secured Trading Service
Manufacturer/Factory
  • Overview
  • Product Description
  • Product Parameters
  • Features
  • Detailed Photos
  • Our Advantages
  • After Sales Service
Overview

Basic Info.

Model NO.
SLQ
Mass Scope of Workpiece
2000kg
Type
Universal Testing Machine
Maxcapacity
<1000KN
Accuracy Grade
0.5
Load Way
Electronic Load
Loading Method
Dynamic Load
Display
Digital Display
Control
Manual Control
Weight
0-100Kg
Power Source
AC220V
Oil Cylinder Position
Top
Test Objects
Transformer, Circuit Breaker, etc.
Description
Universal Primary Injection Test Equipment
Functions
Generate High Current for Electrical Debugging
Application Field
Electrical Industry
Features
Movable 5000A 6V Primary Current Injection Test Se
Advantages
Small Size, Light Weight, Good Quality, Easy Use
Opening Voltage
6V or as Requested
Output Current
1ka to 10ka, Can Be Customized
Structure
Box Type, Integrated or Separated Structure
Control Mode
Manual
Power Supply
AC 220V, 50Hz
Delivery Lead Time
7 Days After The Order Is Confirmed
Shipping Method
Suggest to Ship by Air or Express
Trade Terms
EXW, Fob, DDU, CIF, etc.
Language
English
Transport Package
It Is Packed in Plywood Case
Specification
1kA - 10kA
Trademark
Delta
Origin
China Mainland
HS Code
9031809090
Production Capacity
100 Sets Primary Injection Test Equipment / Month

Packaging & Delivery

Package Size
43.00cm * 43.00cm * 63.00cm
Package Gross Weight
50.000kg

Product Description

SLQ Universal Primary Injection Test Equipment for Substation Assets

Product Description
SLQ Universal Primary Injection Test Equipment is an essential equipment used for electrical debugging to generate high current, which be widely used in power plants, power distribution stations, electrical plants , scientific research, laboratories and other units.

SLQ Universal Primary Injection Test Equipment for Substation Assets is a short-term or intermittent work device and characterized by small size, light weight, good performance, easy use and maintenance.
Universal Primary Injection Test Equipment for Substation Assets


 
Product Parameters
Model Capacity (KVA) Junior Range Secondary  Range Dimensions (mm)
L×W×H
Weight
( kg)
Structure
V1 A1 V2 A2
SLQ-3/500 3 220 15 6 500 430×338×550 45 Integrated
SLQ-6/1000 6 220 27 6 1000 500×380×600 65 Integrated
SLQ-12/2000 12 380 31.6 6 2000 580×400×750 105 Integrated
SLQ-15/2500 15 380 39.5 6 2500 600×430×790 145 Integrated
SLQ-24/4000 24 380 63 6 4000 640×450×820 180 Separated
SLQ-30/5000 30 380 79 6 5000 600×430×900
300×500×500
145
135
Separated
SLQ-36/6000 36 380 95 6 6000 600×430×900
300×500×500
150
140
Separated
SLQ-48/8000 48 380 126 6 8000 600×450×950
350×550×550
180 Separated
SLQ-60/10000 60 380 158 6 10000 800×600×1100
380×550×600
200 Separated
The capacity and maximum current output could be customized according to the requirements of customer if you can not find the one you need in this table.
Features
  1. Two ammeters, can supervise different measurement range.

    With indicator lighting and button, easy to operate Incorporated and dividable structure, easy to move.

    The equipment capacity is designed based on 5-minute short-term work system.

    For intermittent work, working time should be less than 2.5 minutes, before continuing to work it should be shut down for 10 minutes so that all parts of the machine can cool down.
    Universal Primary Injection Test Equipment for Substation Assets
     
    Detailed Photos

     

Universal Primary Injection Test Equipment for Substation Assets
Box type SLQ, output current below 25000A
Integrated desktop type SLQ, output current below 25000A.
Universal Primary Injection Test Equipment for Substation Assets
 
Universal Primary Injection Test Equipment for Substation Assets
Seperated structure SLQ, output current above 25000A.
 
Our Advantages

1. High Quality Product: Most equipment have been on sale for more than 10 years, they are stable, reliable, with high quality and good reputation. All the products have been tested, run well and adjusted to good condition before delivery.

2. Good Faith Cooperation: Honesty is our foundation, we don't brag about the company and products, seek truth from facts, and don't make random promises.

3. Innovative Technology: Based on full experience in designing and manufacturing these equipment, and with users' feedback, we continuously improving our equipment and developing new products.

4. Awesome Service: Provide professional advice and reasonable offers within 2 hours at working time, and within 12 hours at non-working time. One year warranty for all the products, life time technical consulting, life time provision of spare parts, free software upgrades.

Universal Primary Injection Test Equipment for Substation Assets

After Sales Service
1.    Warranty period for all products is One year;

2.    Within warranty period, all quality problems of the instrument shall be repaired by our company free of charge;

3.    Beyond warranty period, our company shall be responsible for life-time maintenance, only the cost of the accessories will be charged;

4.    User manual will be sent with the tester, some testers have demo for review.

5.    If users have question on operation, we supply on-line video training. Users can also come to our factory to get free training.
Universal Primary Injection Test Equipment for Substation Assets

Universal Primary Injection Test Equipment for Substation Assets

Universal Primary Injection Test Equipment for Substation Assets

Universal Primary Injection Test Equipment for Substation Assets

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

From payment to delivery, we protect your trading.
Universal Primary Injection Test Equipment for Substation Assets pictures & photos
Universal Primary Injection Test Equipment for Substation Assets
US $1,000-10,000 / Set
Min. Order: 1 Set
Gold Member Since 2022

Suppliers with verified business licenses

Secured Trading Service
Manufacturer/Factory
Registered Capital
1000000 RMB
Plant Area
>2000 square meters